Co-Op Academy, Manchester
Project Details:
We are proud to have been a part of the Co-op Academy Belle Vue project, where we provided acoustic design advice for a ten-classroom teaching block scaling at 896m2.
Located on the Connell Co-op College campus in East Manchester, this temporary building will house the first intake of pupils while their main site is developed. Our team worked to offer acoustic solutions that ensured compliance with BB93 regulations while simultaneously discharging a series of planning conditions for the project.
The project utilises an offsite construction method which helped deliver the project within short time frames. We are proud to be a part of such an innovative project and believe that our acoustic design advice was critical to the success of this project.
Client: Co-Op Academies
Contractor: Darwin Group
Project Value: £9.7m
Location: Connell College, Manchester
Services: Acoustic Design Advice RIBA Stage 3, BB93, Noise Break In, Noise Break Out, Plant Noise Assessment, Reverberation Control, Sound Insulation Advice, Noise Assessment for Planning Condition Discharge